39

caused certain difficulties in arranging suitable road

crossings and in one instance just south of Heng chow an

overbridge has had to be constructed.

V THE CONSTRUCTION ORGANIZATION.

18. The Construction Administration with headquarters

at Heng chow (mileage 338) is under the charge of a Director

and Engineer-in-Chief who is assisted by an Assistant

Engineer-in-Chief, a General Secretary and a Chief Account-

Transport offices are established in Canton and

Wuchang and three store depots are maintained at Lok Chong,

Hengchow and Chuchow.

ant.

19. The undertaking is divided into 6 main districts,

each with a District Engineer and three to four Section

Engineers. Each District is provided with a Doctor and a

Police Officer with armed forces.

20.

The work is carried out on the Departmental

system with contractors on piece-work rates. Lo cal

contractors and labourers perform most of the earthwork,

but the more involved work is carried out by northerners

and workmen from Shanghai.

21.

A magazine is published monthly and distributed

free to the staff. By this means all are kept informed

of the progress and other relevant details connected with

the work. The District Engineers informed me that the

competitive spirit developed by this magazine has resulted

in increased output and economy.

22.

VI - TRANSPORTATION OF MATERIALS.

The work involved in organising the transportation

of materials has been no mean task. A glance at the map

will show that the divide forms the watershed of the two

main rivers, the Siang and the North, which flow north and

south respectively.

Materials transported by river must,

Comments